Chemical
Breaks rock–oil bonds; removes mud and heavy deposits
MPC combines controlled thermal, chemical and gas-generating effects inside the formation to restore permeability and improve well productivity.
Represented in Pakistan by Prestil Energy Pakistan MPC Technology logo
Deck p.10 gives 500+ wells treated, up to 6x output and 10+ countries (used in the snapshot). Deck p.11 gives 100+ successful projects, 8+ countries and production increases of up to 15x. Which set should the site use?
Chemicals A + B react at the perforations
Hydrogen-led gas mix is drawn into the formation
Hydrocracking and mild pyrolysis of heavy fractions
Chemical C completes the sweep; well activated
Breaks rock–oil bonds; removes mud and heavy deposits
Creates micro-fractures; enlarges pores and channels
Temporary heating near the wellbore, up to 500°C
Pores and fractures plugged by deposits
In-situ reaction drives H-led gas into the rock
Hydrogen and heat attack paraffin, asphaltene
Channels cleared, permeability recovers
Atomic hydrogen forms in-situ, recombines to H2 and penetrates pores
One treatment combines chemical, thermal and gas-driven effects in the near-wellbore zone, with no fracturing.
Real field data. Independent operator validation. Measurable production gains.
Barrels of oil per day (BOPD)
Pakistan
Kuwait
Kazakhstan
CNPC figures reported as 2.8 → 9.7 tonnes/day; BOPD values are approximate (≈).
| Well | Operator | Before | After | Change |
|---|---|---|---|---|
| KAL-03 | OGDCL | 50 BOPD | 750 BOPD | +700 BOPD | +1400% |
| Pasakhi-7 | OGDCL | 375 BOPD | 520 BOPD | +145 BOPD | +39% |
| Adhi-14K | PPL | 60 BOPD | 140 BOPD | +80 BOPD | +133% |
| Well #1 | KOC | 216 BOPD | 300 BOPD | +84 BOPD | +40% |
| Well #2 | KOC | 191 BOPD | 401 BOPD | +210 BOPD | +110% |
| 3 treated wells (average) | CNPC | 2.8 tonnes/day ≈ 20.5 BOPD | 9.7 tonnes/day ≈ 71.1 BOPD | +50.6 BOPD | +246% |
Results officially disclosed by OGDCL through the Pakistan Stock Exchange.
Beyond oil, the treatment also lifted gas production and wellhead pressure:
No adverse impact on casing, tubing, packer integrity or reservoir integrity. PPL recommended broader deployment across additional wells.
Performance evaluated over a 6-month period. KOC confirmed prolonged production sustainability compared with conventional stimulation methods.
Five stages, from candidate wells to repeat campaigns.
Candidate wells & reservoir data
Treatment programme & chemistry
MPC job on a standard workover rig or CTU
Post-job production testing
Offset wells & repeat campaigns