Mud systems
Mud tanks, 2,000–3,000 bbl mud plants, MSB units, shale-shaker sumps.
One workshop from strip-down to repaint.
Partner of Prestil Energy Pakistan IES logo
Strip and assess
Machine, weld, make spares
Sand-blast surfaces
Epoxy / enamel paint
Rebuild and inspect
Mud tanks, 2,000–3,000 bbl mud plants, MSB units, shale-shaker sumps.
Storage, water, diesel, recovery (100 bbl), mixing and safety tanks.
Centrifuge telescopic skids, pump skids, screw conveyors, grating.
Fabrication, modification and maintenance of rig-site caravans.
Mud pumps and centrifugal pumps repaired and maintained.
High-pressure welding, pipeline modifications, blasting and painting.